[1]
Rosidin, K., Rifa’i, M.H., Zulkarnain, D.P., Surahman, S. and Kadang, T. 2026. Critical path method (CPM) for scheduling a type 36 residential house construction at Grand Permata Hijau housing, Samarinda city. Enrichment : Journal of Management. 16, 2 (Jun. 2026), 44-53. DOI:https://doi.org/10.35335/enrichment.v16i2.2495.